Status Update
Crooked ran off and on this summer, Eagle ran all year, Crooked is 4" below, Eagle is .25" above
Big Rain this spring, 20 % wetter than normal
P&N and Drain Office are considering stopping the pump on Crooked, but are waiting as Eagle is still running
Changes Potentially Forthcoming
EGLE permit for 800gpm, expected to be returned within a month
800 is to match Crooked output, so we can't fill Crooked
800 gpm is variable, there will be a switch
There will also be a auto restart switch installed, which should automatically try to restart without sending someone out
Pump will also have an auxiliary input to accommodate the extra 300 gpm, to be determined how to filter that additional water
Questions
Tom didn't officially mention it, but mentioned 74% as the possibly actual runtime of the Eagle Pump
– Why can't we get output rates and more Website info? Tom admitted that there is more information from the reporting system used at the pump. Jason conveyed that it was significant to gather and report on this, and probaby wasn't worth it, and that it might lead to him being called more then now
– Jason and Tom mentioned multiple times that this system is unique to the county, and they are still working through 'kinks'
– Tom R asked about the financing. Jason said the initial cost was 8000/house, he thinks with FEMA and funding, it should be 4000/house, with 5-6 years of contingency for operation. He wouldn't commit to refunds for full pay residents
-Jason pointed out Drain Office would have constructed this, but Township got the FEMA grant, so Drain Office had to supervise a Township project, which has made this messy. He reiterated several times he will not take possession until it is fully functional, and didn't elaborate if that was before or after the new changes
-No legal need to filter Eagle to Crooked, and the auxiliary input to the Eagle pump was designed to be unfiltered initially. Crooked Lake had significant concerns about this, and Jason said he would look into a filter for the Auxiliary input, and stressed that if the pump was working correctly at 500 gpm, the extra capacity might never be needed
-Jason has asked for a Green Light/Red Light on website that tells if the pump is on. Ken confirmed that is it not on there currently
-Wetlands are filling, Leesa N (Crooked) pointed out the Bentwood easement says the pumping has to stop if the wetlands gets to level, and that it is close. Jason and Tom suspect it's the 8th street culvert, that is managed by the Road Commission, and that someone would follow up with them
-Financially, the project will be turned over to Jason once third party audit is complete, it has already been audited by the Township